China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure

Product Details
Customization: Available
Install: Support Installation
Mobility: Fixed
Still deciding? Get samples of US$ 25/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 2 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (15)
  • China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
  • China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
  • China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
  • China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
  • China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
  • China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
Find Similar Products

Basic Info.

Model NO.
JHR-00169
Usage
Building Platforms, Industrial Platform, Leisure And Entertainment Platform, Stage And Viewing Platform, Transportation Platform, Warehouse Rack
Model No.
Steel Structure Warehouse
Steel Columns and Beams
H-Type, Material: Q355b
Wall and Roof
Steel Sheet or Sandwich Panel
Door
Sliding Door, Rolling Daor, Hinged Door
Window
Plastic Steel or Aluminum Alloy Window
Secondary Steel Components
Q235B
Roof Lighting
Polycarbonate Daylighting Board
Roof Ventilation
Unpowered and Powered Fans
Component Anti-Corrosion
Hot DIP Galvanizing or Painting
Connection Method
Bolted Connections
Roof Drainage System
Organized Drainage and Free Drainage
Canopy
Full Length Canopies and Independent Canopies
Warranty
5 Years
Certification
ISO, CE
Purlin
Q235 C and Z Purlin
Transport Package
Load in 40′ Ot or 40′ Hq
Specification
According to Customer Requirement
Trademark
JHR
Origin
Qingdao, China
HS Code
7308900000
Production Capacity
30000 Tons/Year

Product Description

China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure

Warranty: 30 Year Limited Warranty
Type: H-Section Steel
Standard: GB
Trademark: Carbon Structural Steel,
Forming: Hot-Rolled Steel
Connection Form: Bolt Connection

Basic Info.
Model NO. steel structure warehouse Connection Bolt Connection
Wall and Roof Steel Sheet or Sandwich Panel Door Sliding Door, Rolling Daor, Hinged Door
Drawing: Design The Drawing as Your Demand Keyword Steel Structure Warehouse
Window Plastic Steel or Aluminum Alloy Window Beams H Section, Truss Section
Usage Warehouse, Villa, Dormitories, Workshop Certification ISO, CE
Customized Customized After-sales Service Online Technical Support
Warranty 5 Years Material Steel
Transport Package Load in 40′ot or 40′hq Specification Customers′ Requirement
Trademark JHR Origin Qingdao
HS Code 7308900000 Production Capacity 2500ton/Month

Product Description

  China Low Cost Prefab Light Metal Frame Building Prefabricated Steel Structure Warehouse Price
   steel structure warehouse building has features of high fire resistance, strong corrosion resistance. Steel structure warehouse is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect.
 
The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
 
The usage scale includes large-scale workshop, or warehouse, supermarkets, entertainment centers and modular steel structure garage.

1.  Specification

  Items   Specification
  Main Steel Frame   Column   Q235, Q345 Welded H Section Steel
  Beam   Q235, Q345 Welded H Section Steel
  Secondary Frame   Purlin   Q235 C and Z purlin
  Knee brace   Q235 Angle Steel
  Tie Rod   Q235 Circular Steel Pipe
  Brace   Q235 Round Bar
  Vertical and Horizontal  Support   Q235 Angle Steel, Round Bar or Steel Pipe
  Maintenance system   Roof Panel   EPS Sandwich Panel /  Glass Fiber Sandwich Panel /
   Rock Wool Sandwich Panel / PU Sandwich Panel /Steel Sheet
  Wall Panel   Sandwich Panel / Corrugated Steel Sheet
  Accessories   Window   Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
  Door   Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door
  Rainspout   PVC
  Live load on Roof   In 120kg/Sqm (Color steel panel surrounded)
  Wind Resistance Grade   12 Grades
  Earthquake-resistance   8 Grades
  Structure Usage   Up to 50 years
  Finishing Options   Vast array of colors and textures available
  Paint Options   Alkyd paiting, two primary painting, two finish painting
 (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanize

2. Advantages

(1). Free to design architectural drawings for you;
(2). Features: Fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
(3). Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
(4). Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
(5). Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
(6). Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads
China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure
About Us

    China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure        Qingdao Jinhongrui Steel Structure Co., Ltd. was established in 2012 and has become a well-known steel structure company in Qingdao after 10 years of steady development. Group member unit of China Steel Structure Association; Member of the China Association of Building Metal Structures; As a member unit of the China International Chamber of Commerce, it has been rated as a credit enterprise (AAA level) by the Ministry of Commerce and the State owned Assets Supervision and Administration Commission of the People's Republic of China. It has been listed as a modern construction industry production base in Shandong Province and has been awarded the honor of being a famous brand in Shandong Province.
JHR, with its strong technology and rich engineering experience, has obtained the first level qualification for national steel structure engineering professional contracting; Waterproof, rust proof, and thermal insulation; Architectural decoration; Architectural curtain wall professional contractor (B-level), EN1090 certification (CE); Global Advanced Certificate for Ordinary Steel Structures (EXC-3). JHR has now become a high-tech, diversified, and export-oriented international private enterprise that integrates research and development, design, production, installation, construction, and service. JHR has participated in many construction projects, including Haier, Hisense, Sinopec, airports, and subways; And cooperate with large enterprises such as China State Construction Corporation and China Electric Power Construction Corporation.
Guided by the global market, we have chosen the "steel structure+" industrial model; Created its own corporate culture system; Collaborate with universities and institutions; Introduced many senior technical personnel; Optimized our own organizational chart in the form of wheel axles; Established informationized ERP management. We have also innovated automated welding and CNC equipment; Established a comprehensive ISO9001 quality control system ahead of peers; Passed third-party certification. We consistently provide customers with high-quality products and services.
The company adheres to the corporate mission of "social responsibility, enterprise oriented, team oriented, wealth creation, and self-improvement"
Sales and Service Network
JHR has obtained the China Construction Outsourcing Business Qualification issued by the Ministry of Commerce of China and has long-term cooperation with European and American countries. We are targeting the European and American markets and seeking an international development path; Our partners come from Canada, Australia, Germany, France, Brazil, the United Kingdom, the United States, and more, with over 80 countries around the world.
The group adheres to the corporate mission of "social responsibility, enterprise oriented, team oriented, wealth creation, and self-improvement"
China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel Structure

Project Case
China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructurePacking & Delivery:
Inspection: 50% inline inspection and 100% full final inspection, make sure all output w/o any mistake
Packing: per customer's requirements or per product sizes, full protection packing
Shipping: per customer's requirements or per container sizes

China Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureChina Low Cost Design Prefab Light Galvanized Metal Frame Building Prefabricated Construction Industrial Factory Modular Warehouse Workshop Steel StructureSome main oversea projects we undertook in the past couple months: 
1. Tanzanina 450 square meter steel structure workshop
2. New Zealand 207 square meter prefab office
3. French Polynethia 450 square meter steel structure warehouse
4. Ghana 162 square meter powder mining building
5. Maldives 48X30X12M hangar repair building
6. Australia 440 square meter pig feeding building
7. Russia 320 square meter steel structure workshop in two storey
8. Belarus 1150 square meter steel structure warehouse
9. Philippines chicken house
10. Philippines chicken house
11. Ghana 100*12*5m 2 sets chicken house
12. Peru 7*15*20 four strory workshop building
13. Peru 21.5*15*12 workshop building
14. Peru 25*20*24 four strory workshop building
15. Mozambique simple villa house
16. Nigeria 1200 SQM steel structure workshop
17. Samoa 400 sqm steel structure church building
18. Samoa 900 sqm steel structure warehouse
19. Samoa connect plates, Z purlin, two strorey house structure
20. NIGERA 4 SETS 54*13*2.5M chicken house
21. Australia 32*18*6.5m warehouse
22. Samoa Z purlin, connection plate
23. Algeria 54m*13m*2.5m 4sets chicken house
24. Australia 5 sets of 11*20*4.2m farm shed
25. Australia 41.8*18.6*7.7m two storey office building
26. Samoa 24X12X4.5m warehouse 2sets
27. Samoa 14.4*12*3.6 living house
28. Samoa 71.2m*58m*12m two story supermarket building
29. Algeria 54X30X6m workshop building
30. Cookes 75X12X2.5m chicken house
31. Australia LED sign structure (2 sets)
32. Algeria 100X37X9m granite processing workshop
33. Samoa 44.7X33X8.5m supermarket building
34. Saint Lucia 36*15*3 warehouse
35. Saint Lucia office building
36. Qatar car shed
37. Angola 20*18*6.5m workshop and office
38. USA 24*12*4.8M warehouse
39. Australia prefab house
40. Papua New Guinea 4 strory workshop building
41. Mauritius 800 SQM steel structure workshop
42. Uruguay 600 SQM steel structure workshop
43. Georgia 2000 SQM automobile repair house
44. Venezuela 150X15X1.9m chicken shed (12 sets)
45. Panama 2000 sqm Pharmaceutical factory
46. Georgia 1000 sqm steel workshop
47. CAMEROU 1200 sqm church house (3 sets)
48. Ghana 1000 sqm office house (3 sets)
49. India 12500 sqm factory building

FAQ
1. Are you a factory or a trader?

- We are a manufacture factory, and you are welcomed to visit at any time. We can provide you the best quote and our professionalism.
 
2. Can you send engineers or whole team to install my project?
- We will provide detailed installation drawings and video for free. The on-site installation services and engineers are available if required
and the cost shall be borne by the customer.
 
3. What are you main products?
- Our main products have steel structure plant, warehouse, logistic center, stadium, hangar, steel-structure supermarket, high-rise steel
Construction and construction materials.
 
4. What kind of drawing will you provide?
- Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing.
 
5. What's the delivery time?
- Based on your order quantities. In general the delivery time to nearest seaport in China will be 30 days after receiving deposit.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier